Pre-installation Inspection: Before installation, the equipment should be inspected and cleaned to ensure it is intact and undamaged, and any residual debris should be removed.
Installation Location: The equipment should be installed in a well-ventilated, dry location, avoiding direct sunlight and corrosive gases.
Installation Requirements: Ensure the foundation is secure during installation, avoiding tilting or severe vibration. Simultaneously, ensure the connecting pipes are airtight to prevent leaks and environmental contamination.
Regular Maintenance: Regularly maintain and service the equipment, checking all components for proper function and promptly addressing any abnormalities.
Operating Precautions: Operators must strictly adhere to safe operating procedures to avoid equipment damage or wastewater leaks due to improper operation.
Safety Protection: Wastewater treatment equipment may generate harmful gases or radiation during the process. Operators should take appropriate safety precautions, such as wearing protective clothing, masks, or respirators.
Troubleshooting: If a malfunction is detected, immediately stop the machine and notify professional repair personnel. Do not attempt to disassemble or repair the equipment yourself.
Regular inspection: The sewage treatment effect of sewage treatment equipment may be affected by changes in water quality, water quantity, temperature, etc., so it should be inspected and adjusted regularly.